Browsing Category: "Philippines"

Nursing Board Exam Results December 2010 | Nursing Licensure Exam Results December 2010 | NLE Board Results December 2010

Sunday, February 20th, 2011 | Board Exam Results, NEWS, Philippines with 1 Comment

The Professional Regulation Commission (PRC) announced has announced the results Nurse Nurse Licensure Examination given by the Board of Nursing last December 2010. A total of 29,711 new nurses successfully passed the December 2010 Nursing Licensure Board Exam.

Examinees took the exams in the cities of Manila, Baguio, Butuan, Cagayan de Oro, Cebu, Dagupan, Davao, Ilocos Sur, Iloilo, La Union, Legazpi, Lucena, Nueva Ecija, Pagadian, Pampanga, Tacloban, Tuguegarao and Zamboanga last December 2010.

Weanne Myrrh Razon Estrada, a graduate of Adventist University of the Philippines, is the topnotcher of the December 2010 Nursing Board Exam. Estrada is from in Silang, Cavite. She got the highest rating of 88.4%.

The December 2010 and previous successful examinees in Manila will take their Oath of Professional ceremony before the Board on Monday and Tuesday, March 14 and 15, 2011, 8:00 A.M. and 1:00 P.M. sessions at the SMX Convention Center, SM Mall of Asia, Pasay City.

Those who will register are required to bring the following:

  • Duly accomplished Oath Form or Panunumpa ng Propesyonal
  • Current Community Tax Certificate (cedula)
  • 2 pieces passport size picture (colored with white background and complete name tag)
  • 1 piece 1” x 1” picture (colored with white background and complete name tag)
  • 2 sets of metered documentary stamps, and
  • 1 short brown envelope with name and profession

Top 10 successful examinees


RANK             NAME                                   SCHOOL            RATING(%)

1
WEANNE MYRRH RAZON ESTRADA
ADVENTIST UNIVERSITY OF THE PHILIPPINES
88.40
2
MARY GRACE BERMUDEZ RALLO
CENTRAL LUZON DOCTOR’S HOSPITAL EDUCATIONAL INSTITUTION
86.80
3
MARIA KRISTINA PAMINTUAN BICAS
SAINT LOUIS UNIVERSITY
86.60
4
VANESSA GARMA ELUMBARING
SAINT MARY’S COLLEGE-TAGUM
86.40
KIMBERLY MEDINA MALUBAGO
SOUTHERN LUZON STATE UNIVERSITY-LUCBAN (SLPC)
86.40
5
JESSA LORRAINE DEJAN ANDALAN
XAVIER UNIVERSITY
86.20
6
YUGIE CAROLINE MURILLO DEMEGILLO
ILOILO DOCTORS’ COLLEGE
86.00
7
HANAKO SASAKI ARANILLA
FIRST ASIA INSTITUTE OF TECHNOLOGY & HUMANITIES
85.80
TEENA MARIE JUNIO PASCUA
SAINT MARY’S UNIVERSITY
85.80
NONAH VEE CORNELIO SARENO
DAVAO DOCTORS COLLEGE, INC.
85.80
ELNATHAN SAMSON SUBARDIAGA
UNIVERSIDAD DE ZAMBOANGA (for.ZAEC)
85.80
KARL MARIE STA ANA TUVILLA
UNIVERSITY OF NEGROS OCCIDENTAL-RECOLETOS
85.80
8
KARL GABRIEL ALFERI BONIFACIO
COLEGIO DE SAN AGUSTIN-BACOLOD CITY
85.60
DENNIS GONZALES DURAN
PAMANTASAN NG LUNGSOD NG MAYNILA
85.60
BERNADETTE LUMIBAO GUEVARRA
COTABATO MEDICAL FOUNDATION COLLEGE
85.60
CRISELLE LYN GUERRERO LI
FATHER SATURNINO URIOS UNIVERSITY (URIOS COLL)
85.60
VINCENT JUBELAG SUMERGIDO
WEST VISAYAS STATE UNIVERSITY-LA PAZ
85.60
9
JACQUILINE JANE BANZUELA DE JESUS
ARELLANO UNIVERSITY-PASIG
85.40
RIZYL JEM FRANCO JAPITANA
COLEGIO DE SAN AGUSTIN-BACOLOD CITY
85.40
CHRISTINE JANNIE PAEZ RIVERA
PAMANTASAN NG LUNGSOD NG MAYNILA
85.40
NICOLE ANNE ALBALADEJO SALES DIAZ
COLEGIO DE SAN AGUSTIN-BACOLOD CITY
85.40
10
JAIME DELA ROCA BONIFACIO JR
ADVENTIST UNIVERSITY OF THE PHILIPPINES
85.20
MICAELA OREVILLO DE GUZMAN
XAVIER UNIVERSITY
85.20
ROSE ANGELA REYES MAHIPUS
DAVAO MEDICAL SCHOOL FOUNDATION
85.20
IRENE KATE FAUSTINO NICOLAS
PAMANTASAN NG LUNGSOD NG MARIKINA
85.20
CESAR RYAN ESPERA ORTIZ
AQUINAS UNIVERSITY
85.20
ROBY ANN GUTIERREZ PRADO
COLEGIO DE DAGUPAN (for.COMPUTRONIX COLL)
85.20

Top performing schools

RANK
SCHOOL
TOTAL NO.
OF EXAM.
TOTAL NO.
PASSED
PERCENTAGE
PASSED
1
SAINT PAUL UNIVERSITY-ILOILO
124
124
100.00%
2
XAVIER UNIVERSITY
330
325
98.48%
3
SAINT PAUL UNIVERSITY-TUGUEGARAO
193
190
98.45%
4
NEW ERA UNIVERSITY
51
50
98.04%
5
PAMANTASAN NG LUNGSOD NG MAYNILA
196
191
97.45%
6
UNIVERSITY OF SAINT LOUIS-TUGUEGARAO
77
73
94.81%
7
SILLIMAN UNIVERSITY
447
421

Get the complete list of Successful Examinees of the December 2010 Nursing Licensure Examination.

February 25: Holiday For All Schools and Regular Working Day For Private and Government Offices

Thursday, February 17th, 2011 | NEWS, Philippines with No Comments »

Malacañang has declared February 25, 2011 as a holiday for all levels in private and public schools to commemorate the 25th anniversary of the EDSA People Power Revolution. However, it will be a regular working day for all public and private employees. The People Power Celebration runs from February 17 to 27, with the theme “Tatak Edsa: Pilipino Ako, Ako ang Lakas ng Pagbabago [The Mark of Edsa: I am a Filipino, I am the Strength Behind Change].”

The first EDSA People Power Revolution took place from 22 to 25 February 1986. Millions of Filipinos gathered along Epifanio de los Santos Avenue (EDSA) in a non-violent demonstration that led to the deposition of then-president Ferdinand E. Marcos. President Corazon Aquino was installed as president when Marcos was in exile.

How to Avail and Apply for Electricity Discounts (RA 9994) from Meralco and other Power Distribution Utilities?

Sunday, January 23rd, 2011 | NEWS, Philippines with No Comments »

All Senior citizens, through Republic Act 9994, can now avail of a 5% power rate discount from their monthly electricity bills based on Republic Act 9994 starting this January, 2011. The Manila Electric Co. (Meralco) has already issued a statement on Friday, January 21, 2011 that they will start entertaining discount applications. The senior citizen discount is applicable for all distribution utilities in the country.

Image Credit: ieplexus.com

Read the rest of this entry »

Nursing Board Exam Result December 2010 and NLE July 2011 Application Deadlines

Friday, January 21st, 2011 | Announcement, NEWS, Philippines with No Comments »

Are you looking for the December 2010 Nursing Board exam results? Or are you searching for the deadline of filing the applications for the July 2011 Nursing Board Exam?

Photo credit: www.prc.gov.ph

The Nursing Licensure Exam (NLE) results taken last December 2010 is expected to be released on February 2011. Check the Breaking News portion on the right side of this page if the NLE Board Exam Results of December 2010 is already available.

Meanwhile, the Professional Regulation Commission (PRC) has announced through its website the deadline for the filing of application for the July 2011 Nurses Licensure Examination.

According to the PRC, the deadline for repeaters will be on April 15, 2011 and first timers will be on May 13, 2011. All other applications will not be accommodated beyond the specified deadlines.

Applications can now be filed at the PRC Central Office at P. Paredes St., Sampaloc, Manila or in any other PRC regional offices located in the cities of Baguio, Cagayan de Oro, Cebu, Davao, Iloilo, Legazpi, Lucena, Pagadian, Tacloban, Tuguegarao and through satellite offices in Butuan, La Union and Zamboanga.

All applicants are being encouraged by the PRC to file their applications early to avoid long lines at the filing centers.

Biomass power plants worth $8M to be build by Pepsi Philippines in 2011

Thursday, January 20th, 2011 | NEWS, Philippines with 1 Comment

Pepsi-Cola Products Philippines Inc. (PCPPI) will build two biomass power plants, with a combined capacity of 3.4 megawatts, worth $8 million in 2011, according to reports of local news sites.

Photo credit: Scottishpower.com

Biomass plants uses agricultural feedstock as fuel, making it usable 24/7. Unlike other renewable energy sources, biomass plants are not weather dependent. It also allows the production of heat and electricity in one single process, which can be useful in Pepsi’s beverage production.

One of the plant, with 1.2-megawatt capacity amounting to $2.7 million, will be constructed in La Union by Japanese-backed Solutions Using Renewable Energy (SURE). The second plant will be constructed in Cagayan de Oro by US-based Power Source Energy Services, Inc. It will have a 2.2 megawatt capacity worth $4.5 million. PCPPI aims to build a total of 11 biomass power plants in a span of two to three years to complement its softdrinks production in Cagayan de Oro, Cebu, Bacolod, Davao, Iloilo, La Union, Leyte, Muntinlupa, Naga, Pampanga and Zamboanga.

PCPPI commercial director, Rendentor Gabinet explained that the objective of the softdrinks manufacturer in building the two power plants is to reduce electricity costs. The power plant is expected to reduce the cost of electricity by 50% by June 2011. Gabinet added that the use of biomass has a projected “savings at 20% to 50%”  including “overhead cost and all other costs including taxes.”

Philippines | AlxJM.com